 Last additions - 03 March 2018
|

1Z78 THE SALOPIAN EXPRESS 1, with 35018 BRITISH INDIA LINE and WCRC Class 47 47 760 on the rear.463 viewsPhoto : Ken Dickinson 21-Mar-2018Mar 21, 2018
|
|

1Z78 THE SALOPIAN EXPRESS 1, with 35018 BRITISH INDIA LINE and WCRC Class 47 47 760 on the rear.427 viewsPhoto : Ken Dickinson 21-Mar-2018Mar 21, 2018
|
|

68017 HORNET and 68018 VIGILANT waiting in platform 2 for departure on the 10.03am to Barrow-in-Furness (2C47). 379 viewsPhoto : Ken Dickinson 16-Mar-2018Mar 21, 2018
|
|

68017 HORNET and 68018 VIGILANT waiting in platform 2 for departure on the 10.03am to Barrow-in-Furness (2C47). 360 viewsPhoto : Ken Dickinson 16-Mar-2018Mar 21, 2018
|
|

45690 LEANDER and 45407, running as 45157 THE GLASGOW HIGHLANDER, (5Z66) from Bury East Lancs Railway to Carnforth. 482 viewsWith an unusual coupling, engine 2 support coaches engine.
Photo : Kenneth Dickinson 12-Mar-2018Mar 12, 2018
|
|

45690 LEANDER and 45407, running as 45157 THE GLASGOW HIGHLANDER, (5Z66) from Bury East Lancs Railway to Carnforth. 542 viewsWith an unusual coupling, engine 2 support coaches engine.
Photo : Kenneth Dickinson 12-Mar-2018Mar 12, 2018
|
|

After much ‘Will they / won’t they?’ the Class 68s took over one Cumbrian Coast diagram from 12th March 2018.471 views68017 brings up the rear of 2C32 Carlisle to Preston at Forton with 68018 providing the southbound haulage for the three coaches.
Photo : Mark Bartlett 12-Mar-2018Mar 12, 2018
|
|

Under the wires, 142047 slows to call at Salwick with a Blackpool South to Preston Service.689 viewsThe equipment on the platform is a repeater, for the benefit of train guards, showing if the colour light beyond the bridge is ‘On’ or ‘Off’ before they give the ‘right away’ signal.
Photo : Mark Bartlett 07-Mar-2018Mar 09, 2018
|
|

SR Merchant Navy Class 4-6-2 35018 BRITISH INDIA LINE (5M50) as it approached Lostock Hall Station on a test-run round the usual Carnforth circuit.582 viewsPhoto : Kenneth Dickinson 07-Mar-2018Mar 08, 2018
|
|

Large gantries are now being installed at Blackpool North.525 viewsThe platforms are also being finished but it looks like shots of the tower from the station will be a thing of the past.
Photo : Mark Bartlett 02-Mar-2018Mar 05, 2018
|
|

New valances being installed on the L&YR canopy at Poulton-le-Fylde.511 viewsThe old valances were much deeper and the shorter ones are needed to provide adequate clearance for electrification. The line reopens for diesel services on 26th March 2018. Electric services begin with the start of the May 2018 timetable.
Photo : Mark Bartlett 02-Mar-2018Mar 05, 2018
|
|

All masts and Catenary wires now in place at Carleton Crossing.496 viewsPhoto : Mark Bartlett 02-Mar-2018Mar 05, 2018
|
|
|
|